Three versions of our high-quality HP HPE7-A12 dumps VCE file
We sell three versions of our high-quality products which satisfy different kinds of study demands: PDF version, Soft (PC Test Engine), APP (Online Test Engine). A part of candidates are interested in PDF version of HPE7-A12 real dumps as they are accustomed to this simple and traditional learning method.
Questions and answers materials for these three versions of HPE7-A12 premium VCE file are same. Also there are a part of candidates who like studying on computer or electronic products. Soft (PC Test Engine) of HPE Network Data Center Professional Architect Exam VCE files is for candidates who are used to learning on computer. It is installed on the Windows operating system and running on the Java environment. You can use practice test VCE any time to test your own exam simulation test scores. Our HP HPE7-A12 dumps VCE file boosts your confidence for real exam and will help you keep good mood in real test.
APP (Online Test Engine) of HPE7-A12 real dumps has same functions with soft (PC Test Engine). This version is possessed of stronger applicability and generality. By contrast, Online Test Engine of HPE Network Data Center Professional Architect Exam exam VCE is more stable and the interface is more humanized.
We are a team of certified professionals with lots of experience in editing HP HPE7-A12 dumps VCE file. Every candidate should have more than 8 years' education experience in this industry. We have rather a large influence over quite a quantity of candidates. Our HPE7-A12 real dumps are honored as the first choice of most candidates who are urgent for clearing HPE Network Data Center Professional Architect Exam exams. With so many years' concentrated development we are more and more mature and stable, there are more than 9600 candidates choosing our HP HPE7-A12 dumps VCE file. We now have good reputation in this field. We are more than more popular by our high passing rate and high quality of our HPE7-A12 real dumps. Our education team of professionals will give you the best of what you deserve.
7*24 online service support; Best and professional customer service
We have an complete online support system which is available for every candidate who is interested in HP HPE7-A12 dumps VCE file 7*24, and we will answer your query in time, you can ask us about the professionals and can also ask for HP HPE Network Data Center Professional Architect Exam exam, we will offer you the best of solutions free of charge.
Instant Download: Our system will send you the HPE7-A12 braindumps file you purchase in mailbox in a minute after payment. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)
HP HPE7-A12 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Architect the Solution | |
| Prepare and Present the Solution | |
| Analyze Requirements | |
| Determine Customer's Requirements |
HPE Network Data Center Professional Architect Sample Questions:
1. Your long-time customer has just acquired a company and they are planning on bringing the new data center sites up to their standards. They have asked for a bill of materials given only locations and port counts at the data center sites. What are valid assumptions that should be documented in the proposal? (Choose two.)
A) The project will be funded by the capital budget of the acquired company.
B) The acquired company's data center racks are sufficient for the new equipment and will be reused.
C) The acquired company's data center cooling plant allows for the back-to-front airflow preferred by your customer.
D) The acquired company's full-time staff will be converted to contractors.
E) The acquired company's IP schema in the existing data centers will be converted to IPv6.
2. Waratah Hospital, based in Australia, is planning to move many data center services to new facility. (The remaining legacy data center will not be part of this project.) Waratah Hospital hired an external consultant to assist with the new data center network design.
Based on the requirements for the data center network infrastructure, the external consultant has created a high-level design. The below summarizes the content of the design document.
Requirements and information:
- Six racks in the data center room (single row).
- Redundant Top of Rack leaf switches with back-to-front cooling in each rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
- Four 100 GbE uplinks per leaf switch.
- The customer requested to install all switch ports facing the back of the rack racks (hot aisle.)
- OOB management for servers, storage, and network has to be provided through an external switch with back-to-front cooling. This switch has to be included in the solution. One OOB switch provides connectivity for two racks.
- Core equipment for the OOBM network is being reused.
- Middle-of-row spine switches.
-The data center should connect to the hospital building with links that provide 400 Gbps.
- Internet access is provided through an existing firewall cluster with two firewalls, each firewall in one data room. The second firewall is operating in standby mode, VRRP is utilized on the firewalls for failover. The data center network should connect to these firewalls with links that total
100 Gbps.
- The external link is a dark fiber direct link based on single-mode fiber (OS2). The distance to the main hospital 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
- 99.999% uptime for this life-critical environment.
- Planned and unplanned downtime has to be minimized.
- Software upgrades are only allowed once per year with close to zero downtime.
- All life-critical resources are accessed locally, and all resources exist within the hospital campus.
- Waratah Hospital requires a highly secure environment for the data center. Encrypted wire speed connectivity between the data room and the hospital is a must-have because the link between the buildings crosses a public road.
- Waratah Hospital has a mix of virtualized (vSphere) servers. Nutanix storage, bare metal servers, backup servers and other devices.
In the past, the hospital has had a security breach that resulted in data loss, network downtime, and identity theft.
In this scenario, the customers servers are HPE Servers. For the iLO ports, you propose a 6300M switch for each rack. What is the best practice to connect these switches to the data center data plane?
A) You should connect to the ToR switches in each rack.
B) You should connect these switches to the spine.
C) You should connect these switches to the border leaf.
D) You shouldn't connect these switches to the data center data plane.
3. During a design workshop, the customer states their applications are highly sensitive to latency and jitter, such as real-time market data feeds. What design change might you propose?
A) Implement a non-blocking, low-latency spine-leaf fabric with minimal oversubscription and hardware timestamping/PTP support if needed
B) Use store-and-forward switches exclusively to guarantee accuracy over speed
C) Reduce the number of spine switches to simplify the topology
D) Add additional aggregation tiers to increase path diversity
4. To secure the network, which feature or capability should be implemented?
A) Bluetooth dongle
B) Disable access to RESTAPI
C) Control-Plane Access Control Lists
D) VSF on spines/cores layer
5. Which two questions should be asked to properly size the data center fabric's east-west bandwidth requirements? (Choose two.)
A) What is the customer's company founding year?
B) How many parking spots are available at the facility?
C) What is the planned server-to-leaf oversubscription ratio?
D) What color are the server chassis?
E) What is the expected server-to-server ("east-west") traffic ratio compared to north-south traffic?
Solutions:
| Question # 1 Answer: B,C | Question # 2 Answer: D | Question # 3 Answer: A | Question # 4 Answer: C | Question # 5 Answer: C,E |